This is a big investment and an extensive project, so there is no need to rush it. Finishing a basement can be broken down into three distinct projects: the walls, floors and ceilings. It would be great if your basement were in perfect condition and immediately ready for work.
Unfortunately, even for the best basements, there is a bit of preparation work you need to do — not just in your basement, but also at your local government and hardware store. Getting a permit is essential to the job. To get a permit, visit the website of your local government. Permit information can often be found in the Building Department.
You never want to install drywall in your basement before checking for water or high humidity. You just need to take the proper steps to waterproof your work area first.
There are a lot of ways to tackle a damp basement, from a dehumidifier to a sump pump and full basement waterproofing. The direction you go is determined by the severity of the problem. Pro Tip: With the investment you are making in finishing your basement, it is best to consult an expert to see what solution is best for your situation. Drywall or plaster? Drop ceiling or exposed? Carpet or laminate?
These are all questions you should consider before starting the project. While there will be other minor things to consider as the project is completed, these are the big decisions that tend to cost the most. Give them the proper amount of thought. There are plenty of tools needed to finish a basement. Some are simple and you probably already have, such as a hammer or level. From insulation and framing to selecting your paint and finishing touches, follow these steps to finish your basement walls.
While there are plenty of insulation options available, polystyrene foam insulation is one of the simplest for DIY installation without impacting functionality. Here are the six steps to install insulation yourself:. Typically per square foot time spend will decrease with increasing the number of square feet. Many basements have concrete slab in a condition that can be simply use as a subfloor for flooring materials and if the projected height from the floor to finished ceiling will be acceptable there are no concrete work require.
Otherwise, if building codes allow, very time consuming excavation work for increasing the height of basement might be necessary to perform. Pouring concrete and possible extra foundation work will lead to increasing the total time require for completing the project. Also because of a curing time you have to wait an additional couple days or even longer, depending on a temperature and humidity, to be able to walk on it and start actual finishing work.
Rough framing in 1, sq. It might take longer if building arches or performing complicated ceiling work will be involved. All rough in electrical might be completed in a day. However, depending on your area, the condition of the basement, electrical facilities, and the contractors, the time required for a basement makeover can vary.
Framing is the first step to basement remodeling and generally takes less than 5 days depending on the size of the cellar. Your selected renovators will, first, do away with the walls to reshape the room. Then, they will add essentials like bulkheads, which are additional framings required for your basement.
These can be gas lines, HVAC runs, water lines, etc. After the necessary framing, the basement renovators will work on electrical and plumbing outlets. The approximate time taken for this is days depending on the amount of work to be done. The electrical engineers collaborating with your renovation company will work on adding switches, outlet boxes, vanity lights, run wires to box locations, etc.
The plumber in association with your basement reconstruction company will work to implement water lines in the bathroom, toilet, and vanity. He will then restructure concrete, should it require channeling plumbing lines to drains and toilets. Additionally, your contractors will also run water lines up to a wet bar if required. In the province of Ontario, every basement renovation needs to be approved by a city inspector, before the contractor proceeds with remodeling.
Hence, once your selected company finishes off with the above two procedures, they will call the city inspector.